Equinor and German energy company VNG have signed a long-term natural gas supply contract set to last until the end of 2044. The agreement, formalized on November 24 in Oslo, marks the longest Norwegian gas sale deal since the Troll agreements of 1986. Under the terms, Equinor will supply up to 15.3 TWh of gas annually, beginning January 1, 2027, with deliveries reaching about 1.4 billion cubic meters per year. Prices will be market-driven, while other commercial details remain confidential.
Anders Opedal, Equinor's president and CEO, emphasized that the contract addresses long-term European gas demand, with production sourced from the Norwegian continental shelf. The partnership between Equinor and VNG dates back to 1996, with Germany being a key destination for Norwegian gas exports since 1977. Ulf Heitmüller, CEO of VNG AG, highlighted that the deal will enhance supply stability and contribute to energy security in Germany and Europe.
The gas will be transported via existing pipeline infrastructure connecting Norway to Europe. Equinor noted that Norway's gas production is among the lowest-emission operations globally, attributed to electrified offshore platforms and short transport distances. The company expects natural gas to remain part of Europe's energy mix as renewable capacity grows and low-carbon solutions develop.
Separately, TotalEnergies announced plans to boost its US gas production, acquiring stakes in natural gas assets from Continental Resources. The deal aims to add 150 million cubic feet per day to its net gas production by 2032. Additionally, Chevron and Mitsui OSK Lines launched the Fujin Sailor, the first LNG vessel using wind-assisted propulsion, equipped with Wind Challenger sails.