Skip to content
Back to Guavy Wire
Commodities

Karoon Energy Faces Production Deferral at Brazilian Field

Instruments
Oil
Share

Karoon Energy has temporarily shut down one of its wells at the Baúna field in Brazil due to an electrical fault. The SPS-92 well's monitoring system detected a problem on September 22, and a controlled shutdown was performed to investigate the issue.

An analysis revealed a fault in one of the three electrical phases in the newly installed power cable for the downhole ESP. As a result, the pump is now operating on two phases to maintain safe operations.

To reinstate full production, Karoon plans to replace the faulty cabling system with a rig-based well intervention. The company has secured an option over a suitable drilling rig and is currently planning the intervention, including securing permits and services.

The production deferral is expected to be approximately 3,500 barrels of oil equivalent per day until the cable system is replaced. Karoon's CEO, Carri Lockhart, stated that the company will keep the market informed once they have more clarity on the intervention timing.

More on Commodities

Disclaimer: Guavy is a data and market intelligence provider, not an investment adviser. The information, signals, and market analysis provided by the Guavy API and related services are for informational purposes only and are not intended as financial advice, investment recommendations, or an endorsement of any particular trading strategy. Trading in volatile markets, including cryptocurrency, carries significant risk and may not be suitable for all investors. Past performance is not indicative of future results. Users should consult with a qualified financial professional before making any investment decisions. Guavy makes no guarantee of trading profits or financial returns.

Market sentiment intelligence for apps, funds & agents

Location

729 55 Ave SW
Calgary AB T2V 0G4
Canada

© 2026 Guavy Inc