TC Energy Corporation (TSX, NYSE: TRP) has unveiled its next phase of growth for its NGTL System, highlighting plans for the proposed Alberta Growth Connector. This 370-kilometre, 48-inch natural gas pipeline would link Western Canadian natural gas supply to Alberta’s oil sands region, adding approximately one billion cubic feet per day of capacity.
The 2026 NGTL System Annual Plan, expected to be filed with the federal regulator by year end, forecasts a 25 per cent increase in total demand on the system over the next five years. Demand is projected to rise from 14.4 billion cubic feet per day in 2026 to approximately 18 Bcf/d in 2031. This forecast is 1.5 Bcf/d higher than the outlook presented in the 2025 plan, reflecting accelerated demand growth.
François Poirier, TC Energy’s President and Chief Executive Officer, emphasized the role of the NGTL System as a foundational part of the company’s business. The Alberta Growth Connector would leverage existing infrastructure to connect growing supply with demand, with the potential to expand further as customer needs develop.
The project is part of a broader proposed facility plan that includes additional pipeline loops and compressor units. Next steps involve launching additional service offerings as early as January 2027, potentially exceeding 1.3 Bcf/d of new delivery service between 2030 and 2032. TC Energy has invested over $15 billion in the NGTL System over the past decade, expanding its capacity to more than 18 Bcf/d.