Tudor Gold Corp. has unveiled a promising Preliminary Economic Assessment (PEA) for its Treaty Creek Project's Goldstorm Deposit, located in British Columbia's Golden Triangle. The study outlines a 28.25-year underground mine expected to produce 4,677,902 ounces of gold, 22,142,780 ounces of silver, and 209,862 tonnes of copper. The project's economic viability is highlighted by a total projected life-of-mine (LOM) revenue of US$17.8 billion at base case metal prices and US$22.4 billion at upside case prices.
The PEA, prepared by Fuse Advisors and based on the 2025 Mineral Resource Estimate, presents compelling financial metrics. At base case metal prices, the project boasts an after-tax net present value (5% discount rate) of US$2.3 billion and an internal rate of return of 20.0%. These figures improve to US$3.7 billion and 26.8% respectively under upside case scenarios. The initial capital cost is estimated at US$1.54 billion, with a payback period of 3.7 years at base case and 2.9 years at upside prices.
Joe Ovsenek, President and CEO of Tudor Gold, expressed optimism about the project's potential. He noted that the PEA demonstrates the feasibility of a profitable gold-copper-silver mine with long-term viability. The company plans to advance an underground exploration program to expand higher-grade mineralization and reduce mining dilution. Additionally, Tudor Gold aims to explore the nearby Perfectstorm Zone, which has shown promising high-grade gold potential.
The PEA represents a significant step in unlocking the value of Treaty Creek's mineral resources. Tudor Gold's strategy involves leveraging the project's growing potential to develop a scalable, long-life underground gold mine in one of the world's most prospective mining districts.