Boeing Stumbles to Meet 737 MAX Demand Amid Production Woes
Boeing's production of the 737 MAX jet is facing significant challenges as the company struggles to meet demand. According to Boeing CEO Kelly Ortberg, the manufacturer has been unable to stabilize production at a rate of 47 aircraft per month due to delays in its wing manufacturing facility in Renton, Washington State.
Ortberg attributed the issue to internal supply chain problems within the wing factory, rather than external engine supply chain issues. Despite this setback, demand for the 737 MAX remains strong, with Lufthansa Group announcing an order for 20 jets on Thursday, September 17.
Boeing has been working to increase production rates, and the FAA approved a request to boost output from 42 jets per month to 47 in August. However, Ortberg acknowledged that the company is not yet stable at this higher rate, with plans to reach a consistent production level of 52 aircraft per month by next year.
This will require an expansion of operations at Boeing's Everett Factory in Washington State, which currently serves as a secondary facility for building 737 MAX jets. However, before this can happen, Boeing must demonstrate compliance with safety and efficiency regulations to the FAA.