Skip to content
Back to the Guavy Wire
Stocks

GE Fixes Critical Engine Component Ahead of Boeing 777X Delivery Timeline

Instruments
BA
Share

The GE9X engine's certification timeline has been affected by a redesigned turbine seal that balances temperature and pressure between stages. The redesign is part of an ongoing effort to address a crack in the mid-seal, which was discovered during a shop visit for a flight-test engine.

The Wire

Read the full article for free.

A free account opens the rest of this article, how it scored, and the full Wire stream. No card required.

No spam. Unsubscribe anytime.