Oman Liquefied Natural Gas (Oman LNG) is rolling out a series of strategic projects to boost production capacity, enhance operational efficiency, and reduce emissions. A major part of this plan involves transitioning industrial facilities to electricity-powered operations, which will free up more natural gas for production. This shift is expected to increase Oman LNG’s capacity to 13 million metric tonnes per annum (mtpa) by 2030 while also cutting operating costs and improving the use of existing facilities.
The move is projected to deliver significant environmental benefits, including a 16% reduction in direct emissions, a 66% cut in methane emissions from power generation, and a 24% decrease in direct emissions intensity. These initiatives align with Oman’s net-zero ambitions and aim to strengthen the company’s energy efficiency performance.
Another key project in Oman LNG’s expansion strategy is a helium production facility, developed in cooperation with the Ministry of Energy and Minerals and the Oman Investment Authority. Located in the Wilayat of Sur, the facility is expected to produce approximately 1,000 metric tonnes of helium annually. This project aims to bolster Oman’s position in the global helium market, supplying a critical resource for industries such as MRI technology, semiconductor manufacturing, and aerospace.
Oman LNG stated that these initiatives build on its operational achievements and reflect its commitment to industrial diversification and sustainable long-term economic growth. By increasing production, improving efficiency, and developing new industrial opportunities, the company aims to reinforce its competitiveness in international energy markets while delivering value to Oman, its shareholders, and other stakeholders.